Sites
Building Economic Opportunity - Together
SEC Porter & Honeycutt
SEC Porter & Honeycutt RD
- Total Acres: 3.6
- Total SF: 156,816
- Available SF: 156,816
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.
Location
Site / Building Name: SEC Porter & Honeycutt
Address: SEC Porter & Honeycutt Roads
Parcel No: 510-71-016H, 510-71-017D, 510-71-017E, 510-71-018P, 510-71-018E
City: Maricopa
Zip Code: 85138
Physical Characteristics
Total Acres: 0.76 - +/-3.6 acres
Lease/Sale: Sale
Latitude: 33.05753031188001
Longitude: -112.01298484285279
Zoning: C-2
Description: Pads available (0.76-3.60 Acres Contiguous). Located at major arterial crossroads. Commercial corner in growing neighborhood. Possible uses: Shopping center, business/office, fast food QSR, church, medical, investment, etc.
Transportation
Adjacent to Railroad: No
Metro Airport Distance: 30 miles
Regional Airport Distance: 9.3 miles
Freeway Distance: I-10 - 19.4 miles; I-8 - 19.8 miles
Port Distance: 31.6 miles
Utilities
Electric Power Provider:
Electric District 3 (ED3)
Power at Site:
Natural Gas Provider:
Southwest Gas Corporation
Natural Gas Information:
Southwest Gas operates a significant natural gas distribution system in the Maricopa area, including a small high-pressure main along Anderson Road to the west of this site. However, to serve most industrial loads, Southwest would need to reinforce this system by extending a high pressure main up to 3 miles to the northwest of the site. A system evaluation will be performed once the natural gas requirements of the project are provided to determine if any further system improvements will be required. Natural gas service would be extended in accordance with the Arizona Natural Gas Tariff.
Water/Wastewater Provider:
Global Water Resources
Water/Wastewater Information:
Telecommunications:
Orbitel Communications
Telecommunications Services:
High Speed Data (Internet) is fiber-direct meaning the connection is not shared with another entity. Symmetrical capabilities of up to 10G available. In addition, video and phone is available through Orbitel. Distance for build is approximately 2.5 miles using both underground and leasing ED3 fiber (for lower construction costs to end user). Timeline estimated at 12-15 months.